Power Grid: Québec/Baden-Württemberg

הרחבה ל־Power Grid2012Rio Grande Gamesעיצוב: Friedemann Friese

Power Grid: Québec/Baden-Württemberg
  • 2–6שחקנים
  • 120דקות
  • 13+גיל
  • 3.1 / 5מורכבות
  • 7.8BGG

על המשחק

The two maps included in Power Grid: Québec & Baden-Württemberg were previously released in two separate Power Grid base games: Québec is part of Mégawatts, the French edition of the game released by Filosofia, while Baden-Württemberg was included in Funkenschlag: EnBW, a German edition of the game from EnBW.

In Québec, the Canadian province Québec places great emphasis on energy production via ecological hydro power plants. Once an ecological power plant has been added to the power plant market, it will not be put on the bottom of the deck even if it is the highest plant - the highest non-green plant is put on the bottom instead. The two cities of Montreal and Québec City offer several cheap connections, making this map challenging with several layers of decisions for building the best networks.

In Baden-Württemberg, the clocks move differently: The main change focuses on the order of phases of a game round. First, you buy power plants, then you rearrange the player order. Furthermore, as this province is small, several transregional locations may only be connected once Phase 2 begins.

Only a single printing of Power Grid: Québec & Baden-Württemberg will be produced, although the Québec map will remain available in Mégawatts.

Incorporates maps from:

Mégawatts Funkenschlag: EnBW

מנגנונים

קטגוריות

יצירה והוצאה

עיצוב:
Friedemann Friese
הוצאה:
Rio Grande Games, 2F-Spiele

מידע קטלוגי נלקח מ־BGG ואינו מעודכן בזמן אמת.

כתבו מה אתם חושבים על המשחק

מה השחקנים אומרים

עוד אף אחד לא כתב על המשחק הזה.

למכירה (0)

אין כרגע עותקים למכירה.